AI-powered quality engineering

Complete Quality Engineering Platform

From requirements to test cases, automation code, execution, reporting and quality insights — one intelligent platform for your whole QA workflow.

app.qynte.com/dashboard
Release 4.2On track
1,248
Test cases
92%
Coverage
17
Defects
✦ TestGenie — AI test design

Test Cases That Write Themselves

TestGenie turns requirements and user stories into structured, review-ready test cases in seconds — positive, negative and edge paths included.

"As a user, I can reset my password via an email link. The link expires after 30 minutes…"
✦TC-101 · Request reset link✓ ready
✦TC-102 · Link expires after 30 min✓ ready
✦TC-103 · Used link is rejected✓ ready
+ 39 more edge cases in seconds
⚡ AutoPlus — automation engine

From Test Case to Running Code

AI code generation, self-healing locators, run configuration and bulk parallel execution — automation in days, not sprints.

test('reset link expires after 30 min', async ({ page }) => {
await page.goto('/forgot-password');
await requestResetLink('maya@acme.com');
await clock.advance('31m');
await expect(openResetLink()).toBeRejected();
});
✦ generated by AutoPlus — page objects & test data included
⚡ Self-heal on ▦ Page objects
End-to-end visibility

Requirement Traceability, End to End

Every requirement linked to its tests, runs, defects and release — coverage gaps surface the moment they appear, not at the release meeting.

RUS-204 · Password resetJira
TTC-101 · TC-102 · TC-1033 tests
▶Run #58 · nightly CIpassed
✓Release 4.2covered
Reports & insights

Custom Reports, Zero Effort

Build reports from any quality data, schedule them to stakeholders automatically, and walk into release meetings with one readiness score.

94%
Release readiness
Coverage 92% 0 blockers 6 flaky watched
Scheduled Mondays 9:00 → Slack · Email · PDF
The TestPlus workflow

From Requirement to Release,
One Connected Flow

Five connected stages — each one feeding the next, with AI doing the heavy lifting in between.

01

Requirements

Import or capture requirements from Jira, Azure DevOps, documents and more.

✓ US-204 imported from Jira
02

AI Test Generation

TestGenie generates smart, comprehensive test cases from requirements in seconds.

✓ 42 test cases generated
03

Automation Code

Convert test cases into automation-ready code with AI-powered code generation.

✓ Code ready · page objects included
04

Execution

Run manual and automated tests, integrate with CI/CD and track real-time progress.

✓ 182 passed · 2 self-healed
05

Reports & Insights

Advanced dashboards, traceability, coverage and quality insights for better releases.

✓ Readiness 94% — Go
The challenge

Modern QA Teams Face
These Challenges

Manual processes, disconnected tools, and lack of visibility slow down quality and impact release confidence.

01

Manual Test Design Takes Time

Writing test cases by hand is slow, repetitive, and hard to scale across growing products and sprints.

02

Automation Is Disconnected

Automation tools live outside the QA workflow, creating silos between manual and automated testing.

03

Traceability Is Difficult

Connecting requirements, tests, runs and defects across the stack is hard to maintain by hand.

04

Reporting Is Manual & Slow

Hours are lost every week preparing status reports instead of improving product quality.

05

Quality Gaps Are Hard to See

Without live insight, teams miss what's risky for release until it's too late to react.

TestPlus Fixes All of This

One connected, AI-powered platform from requirement to release.

Explore the platform

Platform

One Platform for the Complete Quality Engineering Lifecycle

TestPlus brings test design, test management, automation, execution, reporting, and quality insights together in one connected platform — so nothing falls between the cracks.

  • Generate structured test cases from requirements, user stories and documents using AI
  • Manage cases, reviews, releases, runs, custom fields and collaboration workflows
  • Convert test cases into automation-ready code and reduce scripting effort
  • Monitor coverage, defects, flaky tests, automation health and release readiness

Explore Platform

app.qynte.com/dashboard
Release 4.2On track
1,248
Test cases
92%
Coverage
17
Open defects
Product pillars

Built Around Four
Powerful Capabilities

Four connected pillars that take you from idea to insight — AI-assisted authoring, automation execution, agentic loops that close themselves, and live quality intelligence.

✦ AI test design

TestGenie

Generate, improve, and refine test cases using context-aware AI assistance — your testing buddy in every project.

Explore TestGenie
⚡ Automation engine

AutoPlus

Move faster from manual test cases to automation execution — code generation, self-healing and bulk runs included.

Explore AutoPlus
🤖 Agentic QE

TestGenie Agents

Agents take each requirement from review to coverage, automation and a stable nightly regression. You approve; they execute, fully audited.

Explore Agents
📊 Quality insights

Quality Insights

Understand coverage, execution progress, defects and release readiness in one live view — clear go / no-go signals.

Explore Insights
Enterprise-ready AI

Your AI. Your Data. Your Rules.

Built to pass security review: run TestPlus on your own AI provider, with your data isolated and every action audited.

Bring Your Own AI

OpenAI, Azure OpenAI, AWS Bedrock, Anthropic, Google Vertex or self-hosted. Strict mode keeps every prompt on your own AI.

Bring your own AI →

Security & Enterprise

A separate database schema per customer, SSO and SCIM, an admin console and a full audit trail of people and agents.

See security & enterprise →

Automation that flows

Automate Your QA Workflow, Save Time Effortlessly

Design execution flows the way you think: triggers from your tracker, conditions on priority, AI-generated actions — all visible, all traceable.

  • Trigger test generation when requirements change in Jira or Azure DevOps
  • Route urgent defects and flaky tests to the right owner automatically
  • Self-healing automation keeps suites green — and agents write the fix back permanently

See AutoPlus in Action

Trigger···
  • New story created in Jira
  • Requirement updated
Condition···
  • Priority check
  • If priority: Urgent High
Action 1
  • Generate tests
  • Assign to Senior QA
Action 2
  • Queue automation
  • Notify via Slack
Why TestPlus

Why Teams Choose TestPlus

Built for QA, engineering, and release teams who want less friction and more confidence between requirements and ship date.

Reduce Manual Effort

Generate test cases, code, reports, and insights faster with AI-assisted workflows.

Connect Testing & Automation

Manual testing, automation design, execution and reporting in one platform.

End-to-End Traceability

Link requirements to tests, runs, defects, and releases — coverage gaps surface instantly.

Accelerate Time-to-Automation

Go from approved test cases to a running automated suite in days, not sprints.

Release with Confidence

Readiness scoring, defect heatmaps, and live dashboards give a clear go / no-go signal.

Fits Your Stack

Native integrations with Jira, Azure DevOps, ClickUp, Linear, GitHub and CI/CD — slot it in, don't rip and replace.

0%
less manual test design effort
0×
faster from requirement to test case
0%
requirement-to-release traceability
0
platform for your whole QA lifecycle
Trusted

Trusted by Teams Worldwide

★★★★★

"TestPlus lets us support growing teams, larger test suites, and faster delivery without losing control."

JLJames LeeCTO at Finexa
★★★★★

"Going from requirements to structured test cases in minutes made our QA process dramatically more consistent."

SJSarah JohnsonOperations Manager at VeloTech
★★★★★

"We needed a single place for tests, collaboration, and reporting. TestPlus gave us that without process overhead."

TNThomas NguyenProduct Lead at OrbitLabs
Questions

Need Help? We've Got You.

From features to fit — answers to the questions QA leaders ask us most.

TestPlus is an AI-powered quality engineering platform for QA, engineering and release teams. It brings test case management, AI test generation, automation code, execution tracking and reporting together in one place.
TestPlus goes beyond test case storage. It generates test cases from requirements, maintains end-to-end traceability, tracks execution in real time, and accelerates the journey from manual testing to automation using AI.
Yes. TestGenie turns requirements, user stories and supporting documents into structured, review-ready test cases — reducing manual effort and saving hours during test design.
Yes. TestPlus is built for both. Manual testers get authoring, runs and collaboration; automation engineers get AutoPlus — AI code generation, self-healing, run configuration and bulk execution.
Absolutely. Request a personalized demo and we'll walk through how TestPlus fits your QA process, your team's workflow, and your automation goals.

View full FAQ

See How TestPlus Can Transform
Your QA Workflow

Book a personalized demo to explore AI-powered test generation, execution tracking, and automation acceleration.